BrightOwl Loader Loading

Experiences

Current Experience

  • Project Coordinator in the Technical Service of HHM


    Since February 2015
    management and coordination of several projects to improve hhm production facilities (Vaccines of hepatitis a, b and malaria). including clean piping, decontamination station for Biological waste, risks Analysis (hazop) and action plan coordination. Management and coordination of several projects to improve HHM production facilities (vaccines of Hepatitis A, B and Malaria). Including clean piping, decontamination station for biological waste, risks analysis (HAZOP) and action plan coordination.

  • Project Engineer


    Since November 2012
    coordination and management of several industrial projects, mainly for gsk Coordination and management of several industrial projects, mainly for GSK

Past Experience

  • Project management - Revamping of RX46,0

    June 2014 --- January 2015
    revamping of clean room offices, new changing rooms, airlocks to production facilities and installation of a new hvac group. tasks : - contractors selection - Procurement - project feasibility - overall and detailed Planning - Project Management - Planning coordination and follow-up - construction and Validation management - safety coordination - project closure

  • Project coordination - Revamping of RX39 HAV clean room facilities

    July 2014 --- September 2014
    fasttrack revamping project of production facilities: - revamping of the production clean room facilities of polio Vaccines - remplacement of parts of the chilled water network - modifications and Validation of the hvac in the classified production areas tasks: - overall and detailed Planning - project coordination - site supervision

  • Site supervision - Construction of 2 new production lines

    April 2014 --- June 2014

  • Project coordination - Revamping of polio vaccines clean room facilities

    December 2013 --- March 2014
    fasttrack revamping project consisting of 3 sub-projects: - revamping of the production clean room facilities of polio Vaccines - remplacement of parts of the chilled water network - modifications and Validation of the hvac in the classified production areas tasks: - overall and detailed Planning - project coordination

  • Project Management - Environmental monitoring improvement in clean room

    January 2013 --- March 2014
    improvement of the environmental monitoring systems in 13 different operationnal units (mpu) in response to FDA audits : - modification of grades a areas by addition and relocation of mechanical probes linked to particle and viables counters - installation and Validation of new incubators requested by the increase of viable monitoring tasks : - contractors selection - Procurement - scope definition - project feasibility - overall and detailed Planning - Project Management - Planning coordination and follow-up - construction and Validation management - safety coordination - project closure

  • Training in project management

    April 2013 --- April 2013

  • Private Tutor

    January 2012 --- September 2012
    formateur en math, chimie, physique, Biologie, anglais et stats

  • Intern

    January 2012 --- June 2012
    competitor Analysis and strategic implications

  • Lab assistant in R&D

    July 2011 --- July 2011
    Student job as Lab assistant in R&D department. the objective was to establish a reproductible method of comparison between different cleaning products

  • Thesis

    August 2010 --- June 2011
    title of the thesis: mixotrophic cultivation of scenedesmus obliquus and haematococcus pluvialis using glycerol as a carbon source

  • Lab assistant in R&D

    July 2010 --- July 2010
    Student job as Lab assistant in R&D department.

Knowledge

LinkedIn Assessment :
Project ManagementProject PlanningPharmaceutical IndustryGMPIndustrial SafetyChemical EngineeringBioengineeringBiotechnologyBiosafetyMicrosoft OfficeMicrosoft ProjectEnvironmental ScienceConstruction SafetyDecontaminationIndustrial WastewaterHAZOP StudyBiogasHealthcare ConsultingClean RoomsLifesciencesAseptic Technique

Education

  • MS management, Louvain School of Management in Management from Université catholique de Louvain in 2012
  • BS & MS Bioengineer in chemistry and bioindustry, specialization in environmental technologies in from Université catholique de Louvain in 2011
  • in Chemistry, Management, Environmental analysis from University of Aberdeen in 2010
  • in from Rotary Youth Exchange Program in Ecuador in 2006

Training and Certification

  • BA4 (personnes averties aux risques à proximité d'installations électriques) in 0000 Certification
  • Deelcertificaat van de module Nederlands NT2 Threshold 4A in 0000 Certification
  • Safety for Operational Supervisors SCC (VCA) in 0000 Certification

Area / Region

Ixelles, Belgium

Others

Driving License
  • No

Similar Candidates

Other Candidates in Belgium

Other Candidates in Ixelles

Other similar Candidates in Ixelles

Other Candidates

Most Recent Searches

Most Famous Searches

You might also like